SBIR-STTR Award

New Ion-Laser Bore Material
Award last edited on: 3/14/2002

Sponsored Program
SBIR
Awarding Agency
NSF
Total Award Amount
$50,000
Award Phase
1
Solicitation Topic Code
-----

Principal Investigator
Steven M Jarrett

Company Information

Uniphase Corporation (AKA: JDS Uniphase)

163 Baypoint Parkway
San Jose, CA 95134
   (408) 434-1800
   N/A
   N/A
Location: Single
Congr. District: 17
County: Santa Clara

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
1988
Phase I Amount
$50,000
Ion lasers, which were first used for large-scale commercial applications in the late 1970s, have been improved steadily over the past 10 years. While replacements for these basically inefficient lasers are frequently discussed. these replacements seem always to be just over the horizon. In fact, broadbased commercial applications have been developed on the basis of continuous improvements in reliability and cost reduction. The recent development of dense, vacuum-tight aluminum nitride (AIN) presents the possibility of one more major improvement in this technology. Presently, the plasma- confinement bore is made of beryllium oxide (BeO), which is expensive, poisonous, and suffers from limited availability. AIN, which is being developed as a heatsink material for the electronics industry, is potentially very low cost, non-toxic and is available from a wide range of domestic suppliers. The proposed work will evaluate the suitability of AIN as a laser bore material. Techniques for metalizing and brazing the material must be developed and the material's ability to withstand the heat loads and plasma erosion effects of an air-cooled ion laser must be tested.Anticipated Results and

Potential Commercial Applications:
Commercialization of the AIN technology would be immediate assuming that the results of the technical evaluation indicated above are positive. It is believed that, in air-cooled ion lasers, AIN can be substituted on a one-for-one basis for BeO.

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----