SBIR-STTR Award

Novel Navigation Sensor Suite for 155 mm Artillery
Award last edited on: 8/22/22

Sponsored Program
SBIR
Awarding Agency
DOD : OSD
Total Award Amount
$149,998
Award Phase
1
Solicitation Topic Code
OSD181-001
Principal Investigator
Michael Jankowski

Company Information

Orbital Research Inc

4415 Euclid Avenue Suite 500
Cleveland, OH 44103
   (216) 649-0399
   corporate@orbitalresearch.com
   www.orbitalresearch.com
Location: Single
Congr. District: 11
County: Cuyahoga

Phase I

Contract Number: HQ003419P0035
Start Date: 1/24/19    Completed: 7/23/19
Phase I year
2019
Phase I Amount
$149,998
An affordable suite of sensors will be strategically packaged to produce a reliable, highly accurate and robust IMU capable of surviving the launch and flight environment of a 155mm projectile. This proposed Enhanced Precision IMU (EP-IMU) will be sufficiently small (less than 1.5 cu in), light weight and low power for integration into a 155mm projectile and will provide accurate data measurements of angular motion/rotation and linear accelerations needed to characterize the projectiles orientation/state. To meet this goal, the proposed EP-IMU will utilize an array of IMUs that when passed through a proprietary statistical sensor fusion and calibration methods will provide tactical grade data outputs. The proposed EP-IMU array of sensors will offer spatial and temporal improvements in data while also offering robustness and redundancy especially after gun-launch. This Phase I effort will evaluated the feasibility of the proposed hardware and firmware to meet the specific performance requirements of a 155mm projectile. Through scaled experimentation, key critical areas will be evaluated that will allow the proposed EP-IMU to rapidly mature component technologies for demonstration in Phase II. This effort will leverage the “know how” and expertise gained during the development of complementary high-g survivable electronics for other gun launched projectil

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----