SBIR-STTR Award

Prevention of Corrosion for Navy Aviation
Award last edited on: 10/26/2018

Sponsored Program
SBIR
Awarding Agency
DOD : Navy
Total Award Amount
$79,916
Award Phase
1
Solicitation Topic Code
N091-030
Principal Investigator
Garrth Cooke

Company Information

C2 Technology Inc (AKA: CTI)

1950 Stonewood Drive
Beavercreek, OH 45432
   (937) 429-1198
   gcooke@c2techinc.com
   www.c2techinc.com
Location: Single
Congr. District: 10
County: Montgomery

Phase I

Contract Number: N68335-09-C-0319
Start Date: 5/7/2009    Completed: 11/7/2009
Phase I year
2009
Phase I Amount
$79,916
Development of the Patrol Aircraft Monitoring System will provide the ability to develop an individual aircraft corrosion tracking and repair schema that will utilize the results from the most recent aircraft inspections, predictive algorithms, and effective graphical interfaces to determine the most effective maintenance activities for an individual aircraft based on inspection results (corrosion damage, its severity and location) and the likelihood of future corrosion damage considering likely basing, deployments, and operational requirements.

Benefit:
Upon successful completion of Phase II, C2 Technology, Inc will have developed and fielded a successful tool that provides maintenance managers at all levels with an effective method of economically countering the effects of corrosion on the P-3 fleet through effective tracking, predicting, and scheduling of corrosion maintenance on individual aircraft. Rather than relying solely or principally on experimental data, the algorithms employed will all rely on measured effects on actual metal samples of the types of materials actually used in aircraft construction. Further, the algorithms employed will employ a database consisting of actual structural data from P-3 aircraft coupled with, where available, FMEA and structural integrity studies from that aircraft.

Keywords:
corrosion tracking and prediction, corrosion tracking and prediction, Individual aircraft tracking, corrosion mass loss data, graphical interface, Markov model

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----