SBIR-STTR Award

Innovative Approaches for the Flaw-Tolerant Design and Certification of Airframe Components
Award last edited on: 3/6/2024

Sponsored Program
SBIR
Awarding Agency
DOD : Navy
Total Award Amount
$150,000
Award Phase
1
Solicitation Topic Code
N08-131
Principal Investigator
T Calvin Tszeng

Company Information

Berkeley Materials Research

431 Linda Avenue
Piedmont, CA 94611
   (510) 593-1196
   tszeng@yahoo.com
   www.bmresearch.com
Location: Single
Congr. District: 13
County: Alameda

Phase I

Contract Number: N68335-08-C-0366
Start Date: 7/16/2008    Completed: 12/30/2009
Phase I year
2008
Phase I Amount
$150,000
Fatigue life of airframe components is greatly influenced by many intrinsic and extrinsic factors. The nature of wide scattering in fatigue life makes it very difficult to design a component against fatigue failure. The huge consequences of life and property loss associated with premature fatigue failure therefore push airframe design toward over conservativeness. It is very desirable for airframe industry to have access to an analysis methodology that accurately and reliably treat material variability in the fatigue crack initiation and growth responses of aerospace structural alloys. The goal of the present SBIR project is to fulfill these critical needs by developing a physics-based computational methodology capable of predicting the stochastic nature of fatigue life in airframe components.

Benefit:
The developed methodology will enormously help the better predictions of fatigue life of US Navy and other airframe components with great confidence in design, manufacturing, inspection, maintenance, and management. In the long term, the capabilities enable the development of high reliability materials of superior performance in aircraft structures and other critical components against fatigue failure.

Keywords:
Fatigue, Fatigue, flaw tolerance, Analysis, Lifecycle management, corrosion, initial flaws

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----