SBIR-STTR Award

Design and Simulation Tools for Planetary Atmospheric Entry Vehicles
Award last edited on: 1/13/2021

Sponsored Program
SBIR
Awarding Agency
NASA : ARC
Total Award Amount
$99,916
Award Phase
1
Solicitation Topic Code
S5.02
Principal Investigator
Leslie A Yates

Company Information

Aerospace Computing Inc (AKA: ACI)

465 Fairchild Drive Suite 224
Mountain View, CA 94043
   (650) 988-0388
   acihq@aerospacecomputing.com
   www.aerospacecomputing.com
Location: Single
Congr. District: 18
County: Santa Clara

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2008
Phase I Amount
$99,916
Atmospheric entry is one of the most critical phases of flight during planetary exploration missions. During the design of an entry vehicle, experimental and analytical methods are used; however, the current integration level of experimental and analytical methods with planetary entry simulations is low. Comprehensive software, comprised of multiple design tool components for simulating planetary entry, analyzing experimental data, and evaluating configuration modifications and control designs, will be developed. The software will be configured so that it can accommodate vehicles ranging from blunt bodies to aircraft-like configurations. Furthermore, the software will be designed as an extension of current aircraft flight dynamics theory so that aerospace engineers with basic flight dynamics knowledge will have an easy transition to entry body flight dynamics. Merging of the aircraft and entry vehicle flight dynamics enables educational institutions to adopt entry vehicle flight dynamics as an extension to current aircraft flight dynamics educational programs. This will promote the education of the next generation of engineers with the basic knowledge of entry flight dynamics. The proposed software will run on a desktop / laptop computer so that proof-of-concept design work can be done easily, efficiently, and at low cost.

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----