SBIR-STTR Award

Reliability Prediction and Assessment of Missile Electronics
Award last edited on: 10/31/2012

Sponsored Program
SBIR
Awarding Agency
DOD : MDA
Total Award Amount
$99,553
Award Phase
1
Solicitation Topic Code
MDA11-017
Principal Investigator
Glenn T Hess

Company Information

AET Inc (AKA: Advanced Engineering Technology)

1900 South Harbor City Boulevard Suite 225
Melbourne, FL 32901
   (321) 727-0328
   tjs@aet-usa.com
   www.aet-usa.com
Location: Single
Congr. District: 08
County: Brevard

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2012
Phase I Amount
$99,553
The objective of this program is to develop innovative methodologies that will aid in the long term reliability assessment of missile electronics in support of the Missile Defense Agency’s Stockpile Reliability Program. AET, Inc. will perform a detailed study of existing electrical, physical and environmental tests that are commonly applied to accelerated aging and reliability prediction. New electrical, physical and environmental tests that may be used to determine reliability will also be proposed. These tests will be based on the possible physical changes that could happen to an integrated circuit over its lifecycle. As part of the environmental testing, AET will investigate radiation testing. The development of innovative systematic methodologies will be coupled with advanced techniques to assess the long term reliability of missile electronics. Proven methodologies for age acceleration testing of typical missile electronics such as in-situ sensors, health monitoring, and prognostic monitoring will be coupled with advanced reliability assessment techniques such as radiation testing to develop a cost effective approach to predicting missile electronics reliability and shelf life estimates.

Keywords:
Accelerated Aging, Stockpile Reliability, Microelectronics, In-Situ Sensor, Reliability Prediction, Health Monitoring, Built-In-Test, Radiation Testing

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----