SBIR-STTR Award

The ADESORB Process for Economical Production of Sorbents for Mercury Removal from Coal-Fired Power Plants
Award last edited on: 8/29/2006

Sponsored Program
SBIR
Awarding Agency
DOE
Total Award Amount
$99,902
Award Phase
1
Solicitation Topic Code
-----

Principal Investigator
Ramon E Bisque

Company Information

Advanced Emissions Solutions Inc (AKA: ADA-ES LLC~Earth Sciences, Inc~ADA Environmental Solutions LLC~Advanced Emissions Solutions Inc)

8051 E Maplewood Avenue Suite 210
Greenwood Village, CO 80111
   (720) 598-3500
   contactus@adaes.com
   www.adaes.com
Location: Multiple
Congr. District: 06
County: Arapahoe

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2006
Phase I Amount
$99,902
The injection of activated carbon into the flue gas has been shown to mitigate the emission of mercury in all coal-fired power plants, even those with wet and dry scrubbers. This is a low-capital-cost technology in which the largest cost element is the cost of the activated carbon sorbent. Therefore, the obvious approach to further cost reductions is to reduce the amount of sorbent needed or to decrease the cost of sorbent production. This project will develop a new process for the production of sorbents that will dramatically reduce production costs and increase production capacity in both existing and new activated carbon production facilities. Phase I will define the processing parameters that produce an optimized sorbent at the lowest manufacturing cost. Sample sorbent materials will be produced in the laboratory and tested with flue gas to determine the capability for capturing mercury. Phase II will focus on scaling-up the manufacturing process and producing sufficient quantities of the sorbent for use in a full-scale mercury control test at one or more coal-fired power plants.

Commercial Applications and Other Benefits as described by the awardee:
The target market for the sorbent is coal-fired power plants that need to control mercury emissions. In addition to the power companies themselves, electricity consumers should also benefit from lower electric rates, if the power plants were to use economical means to comply with pollution control regulations