SBIR-STTR Award

Innovative, New and Advanced High Voltage Power Supply for Capacitor Charging at Linear Collider
Award last edited on: 4/2/02

Sponsored Program
SBIR
Awarding Agency
DOE
Total Award Amount
$98,406
Award Phase
1
Solicitation Topic Code
-----

Principal Investigator
Wesley G Clanin

Company Information

International Power Group Inc

822 233rd Street SE
Bothell, WA 98021
   (425) 481-7441
   N/A
   N/A
Location: Single
Congr. District: 01
County: Snohomish

Phase I

Contract Number: DE-FG03-99ER82806
Start Date: 00/00/00    Completed: 00/00/00
Phase I year
1999
Phase I Amount
$98,406
The DOE requires a power supply for capacitor charging for a new linear accelerator. The supply must be over 90 percent efficient, reliable, and cost effective to manufacture and maintain. In addition, the market now demands decreased size while maintaining or increasing power output. This project will design and build a new high voltage power supply which is compact, cellular, easy to manufacture, over 95 percent efficient, and more reliable than a conventional power supply design. In Phase I, the feasibility of the new cellular power supply concept will be proven by using computer modeling and simulation along with the development and testing of a scaled down prototype. Based on the models, simulations, and prototype testing, the design for the high voltge power supply will be completed in order to meet the specification requirement for the linear collider.

Commercial Applications and Other Benefits as described by the awardee:
Given its low stored energy and precise output, the new cellular high voltage power supply should improve design and performance of radar, x-rays, lasers, power vacuum tubes, and high voltage capacitor charging.

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----