SBIR-STTR Award

Room Temperature Ballistic Testing Backing Material
Award last edited on: 7/1/2016

Sponsored Program
SBIR
Awarding Agency
DOD : Army
Total Award Amount
$99,999
Award Phase
1
Solicitation Topic Code
A14-086
Principal Investigator
Alex Vainer

Company Information

POLYMERight Inc

4404 Enterprise Place Suite C
Fremont, CA 94538
   (510) 252-9090
   mailcenter@polymeright.com
   www.polymeright.com
Location: Single
Congr. District: 17
County: Alameda

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2015
Phase I Amount
$99,999
Project targets a ballistic backing material (BBM) with controllable formulation/mechanical behavior relationship that passes column drop calibration test at room temperature. The main goal of Phase I is to demonstrate feasibility of prototypes with deformation rates as RP#1, and known/controllable composition, microstructure and mechanical properties. POLYMERights polyester polysulfides (PEPS) show great potential as binders for BBMs. PEPS are flexible and pliable; their viscosity is weakly correlated with temperature, they are non-thixotropic, highly ageing resistant, and keep mixtures viscosity unchanged over broad temperatures range. PEPS are non-hazardous and environmentally-safe, with NFPA ratings Health 0, Flammability 1, Reactivity 0. POLYMERight has already conducted a demonstration trial to ensure that the proposed BBM composition is feasible. PEPS binders, fillers, and their ratios were selected randomly. BBMs were tested at 24C alongside with RP#1 at 38C. BBMs have demonstrated performance that is very close to RP#1, with weak penetration depth/temperature dependency, proving feasibility of achieving the goals of the project. POLYMERight will select best candidates for binders, fillers and plasticizers and establish the components ratio to best approximate the RP#1properties; then conduct all required testing and ensure that the formulation can serve as a prototype for a new generation of BBM.

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----