SBIR-STTR Award

Tension/Extension Test Device for Ultra High Stren
Award last edited on: 7/8/2010

Sponsored Program
SBIR
Awarding Agency
DOD : Army
Total Award Amount
$69,979
Award Phase
1
Solicitation Topic Code
A09-097
Principal Investigator
Danny J Frew

Company Information

Dynamic Systems & Research Corporation

8219 Pickard Avenue Ne
Albuquerque, NM 87109
   (505) 270-3088
   djfrew@dsr.us.com
   www.dsr.us.com
Location: Single
Congr. District: 01
County: Bernalillo

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2010
Phase I Amount
$69,979
In this program, DSR proposes to develop a multi-use test system that will be capable of mechanically testing conventional and ultra high-strength geologic and man-made materials and obtaining post-peak stress-strain properties in tri-axial compression and direct tension/ extension (DTE) configurations. In Phase I, mechanical and hydraulic conceptual designs will be developed for the dual-use test device with the capability to apply confining pressures up to 200 MPa to right-circular cylinder samples. This phase will also include developing the servo-hydraulic architectures needed to obtain post-peak material property data for these materials. In the Phase I option portion of this program, DSR plans to design a highly-accurate instrumentation configuration that will allow for accurate measurements as well as provide the servo-loop feedback necessary to obtain the required post-peak behavior of the test sample. In Phase II, the mechanical, hydraulic, and instrumentation designs developed in the Phase I effort will be built, and tested under a variety of different conditions to demonstrate the ability for this device to capture post-peak behavior of test samples.

Keywords:
Direct Extension, Tension, Confinement, Ultra High-Strength Concrete, High-Pressure, Servo-Hydraulic

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----