SBIR-STTR Award

Advanced Hypersonic Engine Manufacturing System
Award last edited on: 7/6/2023

Sponsored Program
SBIR
Awarding Agency
DOD : AF
Total Award Amount
$1,499,502
Award Phase
2
Solicitation Topic Code
AF211-DCSO2
Principal Investigator
Robert Bakos

Company Information

Innoveering LLC

100 Remington Boulevard
Ronkonkoma, NY 11779
   (631) 793-8439
   info@innoveering.net
   www.innoveering.net
Location: Single
Congr. District: 01
County: Suffolk

Phase I

Contract Number: 2022
Start Date: ----    Completed: 3/3/2022
Phase I year
2022
Phase I Amount
$1
Direct to Phase II

Phase II

Contract Number: N/A
Start Date: 6/5/2023    Completed: 3/3/2022
Phase II year
2022
(last award dollars: 1688642918)
Phase II Amount
$1,499,501

This project will increase the pace of high-speed airbreathing engine development and prototyping by deploying state-of-the art commercial additive manufacturing (AM) capabilities together with transformative design software in a hypersonic engine development shop with collocated design and test capabilities. To accomplish this goal, our team will install the most advanced metal laser powder bed fusion machine and implement advanced generative design capability to produce engines incorporating high-performance thermal-structural heat-exchanger designs. This integrated capability will significantly reduce the design/build/test iteration cycle time completing multiple one-piece, actively-cooled scramjet engine iterations within twelve months. Further, the prospect of an AM engine build as a one-piece, monolithic structure removes significant challenges with joining and sealing engine sections that will deliver benefits from reduced complexity, weight, integration, and cost during development, prototyping, and production.