SBIR-STTR Award

Dynamics-based Nondestructive Structural Health Monitoring Techniques
Award last edited on: 4/9/2010

Sponsored Program
STTR
Awarding Agency
DOD : AF
Total Award Amount
$99,998
Award Phase
1
Solicitation Topic Code
AF08-T016
Principal Investigator
Vinod Sharma

Company Information

Millennium Dynamics Corporation

518 Atlanta Street SE
Marietta, GA 30060

Research Institution

----------

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2008
Phase I Amount
$99,998
The objective of the proposed research program is to advance the state-of-the-art in structural health monitoring (SHM) through an innovative research program, which effectively addresses the need for an approach capable of detection, diagnosis, and prognosis of damage in aerospace structures. More specific objectives are to use Guided Wave (GW) inspection in conjunction with full-field measurements as the basis for the development of novel analysis tools, which estimate phase gradients of propagating waves for an accurate damage location, predict mode conversion coefficients for damage quantification, evaluate scattering patterns for detailed damage characterization, and allow the determination of Stress Intensity Factors related to different types of damages. The development of the analysis tools will rely on novel and efficient analytical and numerical techniques, including spectral finite element methods and perturbation methods, for the simulation of the interaction of waves propagating in one-dimensional (1D) and two-dimensional (2D) complex structures with various types of defects. Finally the developed concepts and techniques will be transitioned from the laboratory to the field using a novel ultrasonic scanning Laser system, capable of simultaneously recording in-plane and out-of-plane velocity components at extremely high frequencies. BENEFIT

Keywords:
Shm, Laser Doppler Vibrometry, Nde, Damage Detection, On-Board Structural Health Monitoring

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----