SBIR-STTR Award

In-Situ Development Of High Aspect Ratio Boride Reinforcements In Fine Grained Tiai Alloys To Enhance Elevated And Room Temperature
Award last edited on: 11/13/02

Sponsored Program
SBIR
Awarding Agency
DOD : AF
Total Award Amount
$47,267
Award Phase
1
Solicitation Topic Code
-----

Principal Investigator
Ranjan Ray

Company Information

Marko Materials Inc

19-1 Sterling Road PO Box 3
North Billerica, MA 01862
   (508) 663-2210
   N/A
   N/A
Location: Single
Congr. District: 06
County: Middlesex

Phase I

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase I year
1990
Phase I Amount
$47,267
Gamma- TiAl based intermetallic alloys have potential air force applications for temperatures up to 1800 deg f. Alloy development research h as show that compositions (in atom %) such as ti-48al-2mn-2nb exhibit some room temperature ductility and good high temperature oxidation re sistance. However, research is necessary to optimize the room tempera ture mechanical properties such as ductivity, toughness and impact resinstance, as well as the high temperature mechanical properties such as tensile strength, fatigue and creep growth rates. The proposed research aims to achieve optimum room and elevated temperature mechanical properties by in-situ development of a critical volume fraction of high aspect ratio boride reinforcements of size >10 micrometers in a fine grained (<10 micrometers) gamma- TiAl l matrix by rapid solidification an d powder metallurgical processing. Based on continuum mechanics considerations, improve creep resistance is expected from boride reinforcem ents. Improved ductility is expected from the fine grain size of the gamma- TiAl matrix because of the reduced slip length and the lower str ess concentration at the grain boundaries. Phase i research will investigate the effect of cooling rate 10(4)-10(6) k/s and the boron content 0-10 at % in order to obtain the optimum microstructure for the desired mechanical properties.

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----