SBIR-STTR Award

Rad-hard Location and Attitude Module (R-LAM)
Award last edited on: 6/25/2020

Sponsored Program
SBIR
Awarding Agency
NASA : ARC
Total Award Amount
$99,996
Award Phase
1
Solicitation Topic Code
S4.02
Principal Investigator
William Dillard

Company Information

Archangel Systems Inc (AKA: Archangel Avionics Inc)

1635 Pumphrey Avenue
Auburn, AL 36832
   (334) 826-8008
   contact@archangel.com
   www.archangel.com
Location: Single
Congr. District: 03
County: Lee

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2010
Phase I Amount
$99,996
R-LAM (Rad-hard Location and Attitude Module), promises a new generation of both integrated navigation modules and stand-alone navigation subsystems including nav-grade IMU's, atomic-precision clocks and GPS units compliant with the Space Plug and Play Architecture (SPA) initiative. R-LAM leverages two active DARPA MTO programs. In the Navigation-Grade Integrated Micro-Gyroscope (NG-IMG) project, Archangel Systems, Inc. has developed a MEMS IMU called NG-MARS - a spinning mass IMU with navigation-grade performance. In DARPA's Chip-Scale Atomic Clock (CSAC) program, Symmetricom, Inc has developed a clock that is 50-100X smaller and lower power than any previous atomic clock technology, while exhibiting short-term stability of y(τ) < 1x10-10/1/2 and long-term drift of < 3 x 10-10/month. NASA-Goddard has constructed a rad-hard GPS called Navigator for the Magnetospheric Multiscale (MMS) program. Designed for high elliptical orbits (HEO), Navigator uses NASA's Geon algorithms. Currently Navigator weight and power exceeds R-LAM requirements. NASA-Goddard colleagues will advise the R-LAM team as they transition Navigator hardware. Intrinsix Corp. is an ASIC design house skilled in rad-hard mixed-signal design. They will implement rad-hard support electronics for NG-MARS, CSAC and Navigator. Intrinsix is familiar with NASA's SPA initiatives and will design the R-LAM interface for compliance.

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----