SBIR-STTR Award

Mobile Lightweight Folding/Expandable (LIFE) Bridge
Award last edited on: 8/8/2025

Sponsored Program
SBIR
Awarding Agency
DOD : Navy
Total Award Amount
$1,739,800
Award Phase
2
Solicitation Topic Code
N232-079
Principal Investigator
William Kidd

Company Information

Physical Sciences Inc (AKA: PSI Technology~PLCC2 LLC)

20 New England Business Center
Andover, MA 01810
   (978) 689-0003
   contact@psicorp.com
   www.psicorp.com
Location: Single
Congr. District: 06
County: Essex

Phase I

Contract Number: 2025
Start Date: ----    Completed: 11/8/2023
Phase I year
2024
Phase I Amount
$239,843
Physical Sciences Inc. (PSI) proposes to develop a lightweight, portable, rapid deploying hinged bridge system. Existing mobile bridges are big, heavy, expensive, armored and transported by Abrams class vehicles. The PSI solution provides gap crossing for a new era of smaller independent vehicles without committing large dedicated resources. PSIs mobile Lightweight Foldable/Expandable (LIFE) bridge solution is transported within weight and volume constraints or towing capacity of the MTVR. The LIFE bridge can be deployed and retrieved within 5 minutes, and can support loads for MLC-60 standards to span a 15 m gap.

Benefit:
Existing solutions for mobile gap crossings are developed for large scale military mobilization operations using heavy, armored, expensive equipment. There is an emerging need for mobile lighter weight solutions with less commitment of specialized vehicle assets and personnel that still provide rapid access for smaller scaled missions. The proposed solution will provide gap crossing access to smaller teams with faster lighter vehicles with a larger scoped vision to provide overlapping applications to UGV systems. The proposed system will be designed for a final product capability for unmanned operation. The stowed system volume can be transported within MTVR and air transport cargo constraints. Commercial applications extend to emergency and disaster support operations where flooding, earthquake, coastal storms, etc., can wash out roads and bridges to deny essential supplies to stranded civilians.

Keywords:
Transportable, Transportable, rapid, Composite, temporary, Structure, BRIDGE, Lightweight, deployable

Phase II

Contract Number: M67854-24-C-6500
Start Date: 3/6/2025    Completed: 6/23/2025
Phase II year
2025
(last award dollars: 1754651851)
Phase II Amount
$1,499,957

Physical Sciences Inc. (PSI) proposes to develop a lightweight, portable, rapid deploying hinged bridge system. Existing mobile bridges are big, heavy, expensive, armored and transported by Abrams class vehicles. The PSI solution provides gap crossing for a new era of smaller independent vehicles without committing large, dedicated resources. PSIs mobile Lightweight Foldable/Expandable (LIFE) bridge solution is transported within weight and volume constraints or towing capacity of the MTVR. The LIFE bridge can be deployed and retrieved within 5 minutes, and can support loads for MLC-60 standards to span a 15 m gap.

Benefit:
Existing solutions for mobile gap crossings are developed for large scale military mobilization operations using heavy, armored, expensive equipment. There is an emerging need for mobile lighter weight solutions with less commitment of specialized vehicle assets and personnel that still provide rapid access for smaller scaled missions. The proposed solution will provide gap crossing access to smaller teams with faster lighter vehicles with a larger scoped vision to provide overlapping applications to UGV systems. The proposed system will be designed for a final product capability for unmanned operation. The stowed system volume can be transported within MTVR and air transport cargo constraints. Commercial applications extend to emergency and disaster support operations where flooding, earthquake, coastal storms, etc., can wash out roads and bridges to deny essential supplies to stranded civilians.

Keywords:
temporary, deployable, rapid, Lightweight, Composite, BRIDGE, Structure, Transportable