SBIR-STTR Award

Self-Powered Wireless Sensing and Control of Intelligent Facilities
Award last edited on: 12/17/2013

Sponsored Program
SBIR
Awarding Agency
DOE
Total Award Amount
$150,000
Award Phase
1
Solicitation Topic Code
35 a
Principal Investigator
Adam Bingaman

Company Information

NanoSonic Inc

158 Wheatland Drive
Pembroke, VA 24136
   (540) 626-6266
   info@nanosonic.com
   www.nanosonic.com
Location: Single
Congr. District: 09
County: Giles

Phase I

Contract Number: DE-FG02-11ER90012
Start Date: 6/17/2011    Completed: 5/16/2012
Phase I year
2011
Phase I Amount
$150,000
Measurement and efficient control of power consumption of High Performance Computing (HPC) and HVAC subsystems within facilities are less than adequate for meeting newly developing and improving efficiency standards. Energy management systems, including sensors, signal processing, feedback and control are needed to increase efficiency, operational cost and intelligence of facilities. Additionally, these systems must operate with low power consumption to aide in the effort of efficiency. Through Phase I efforts, Nanosonic will demonstrate wireless transmission of sensed environmental and power consumption data of a facility to improve the efficiency and intelligence of the HPC system. Sensors remotely deployed in the necessary subsystems will measure operational points, transmit and analyze data, and respond to the system via feedback (actuators, switches, etc) to alter output. Additionally, the sensors and transmitters will have no power footprint, as power harvesting of waste energy will power the extremely low-power hardware, thus eliminating the need for wires. Commercial Applications and Other

Benefits:
Wireless, low-power energy harvesting data feedback systems have countless commercial and residential applications for improving facility efficiency. Operating conditions of any structure obtained through such a system can be compared to the users requirements, thus reducing power consumption and operational cost while improving efficiency. As a result, the facility will be closer to operating certifications, such as Leadership in Environmental and Energy Design (LEED).

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----