SBIR-STTR Award

Parallel Operation of Compact, Efficient Turbogenerators for Robust Tactical Energy Independence
Award last edited on: 11/6/2023

Sponsored Program
SBIR
Awarding Agency
DOD : OSD
Total Award Amount
$99,956
Award Phase
1
Solicitation Topic Code
OSD10-EP1
Principal Investigator
David Wehrlen

Company Information

Barber-Nichols Inc

6325 West 55th Avenue
Arvada, CO 80002
   (303) 421-8111
   info@barber-nichols.com
   www.barber-nichols.com
Location: Single
Congr. District: 07
County: Jefferson

Phase I

Contract Number: FA8650-11-M-2133
Start Date: 12/9/2010    Completed: 6/10/2011
Phase I year
2011
Phase I Amount
$99,956
The intent of this project is to explore the feasibility of using a parallel connection strategy similar to a utility solution for the operation of multiple high speed turbo-generators in the 10 to 50 kW range. It is desired to connect the high frequency, 3-phase outputs of multiple turbo-generators in parallel to produce a single high frequency bus of significantly higher power, up to 500 kW. This single high power bus would then feed into a rectifier/inverter stage to produce a 60 Hz output which would be readily usable for both commercial and military loads. It would be very desirable for the 60 Hz converter stage to be based on multiple parallel converters each having the same power capacity as the turbo-generators. This would allow the number of operating turbo-generators and 60 Hz converters to be increased or decreased in step to control the total combined output power while maintaining redundancy and high efficiency in both stages.

Keywords:
Micro-Turbine, Power, Generator, Utility, Turbogenerators

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----